Initially this requires the reexamination of an existing facility to ascertain its preformance criteria and where operational failings are occurring. Once these have been identified a programme can be prepared for a corrective action programme. The methodology and probable financial cost of this programme can then be proposed.
The signs that a project reconception may be required are:
- Drop in occupancy levels
- Reducing rental income
- Dropping footflow